Pipeline-49 arrived o/s reporting heavy fire thru the roof of a 1-1/2 story sfd, with the bldg being well involved. All hands were placed into svc using heaviest water lines for an exterior attack only.
The number of pictures is limited due to the Heavy rain at the time.