16 September 2009. Site of future shop building, on north side of mainline. The museum land begins approximately at the roadway. This area is gradually being filled for future track and shop. Access to this site is via the roadway in front of the bulldozer, which crosses our mainline realignment. A proper grade crossing will be built as part of the realignment project.